(This measure has not been amended since it was introduced. The expanded summary of the House reported version is repeated here.)
Hydropower Regulatory Efficiency Act of 2012 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements.
(Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements.
Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria.
Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of five megawatts, and (3) is not currently licensed or exempted from license requirements.
Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
Authorizes FERC to exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer.
(Sec. 5) Authorizes FERC to extend the preliminary permit period for up to two additional years beyond the three years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence.
(Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects.
(Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits.
House Jul 9, 2012
Hydropower Regulatory Efficiency Act of 2012
Passed · Two-thirds required
372 Yea 0 Nay 59 not voting
Crossed both parties No voting member broke with their own party.
DemocratsRepublicansFilled: YeaRing: NayGrey: not voting or present
431 members on this roll call, from the official House record. Party majorities need at least five voting members, so an independent never counts as breaking with a party.
Signing on is not a vote: a member can cosponsor H.R. 5892 and vote against it. 7 signed when it was filed.
Written by the nonpartisan Congressional Research Service, describing H.R. 5892 as passed House without amendment on Jul 9, 2012. It is not the text of the measure; a later amendment may have changed what it does.
Organizations that named H.R. 5892 in a lobbying disclosure. Only those that cited the bill by number appear, so this is a floor, not a full list.
57 disclosures name this measure. Retrieved from LDA.gov on 2026-10-05. Senate Office of Public Records cannot vouch for the data or analyses derived from these data after the data have been retrieved from LDA.gov.